Tag Archives: Texas

HVDC Technology: When 2,000 MW is 2,000-Plus-1,200 MW

  by Pterra Consulting   In this Blog, we discuss the amazing story of how a lowly 2,000 MW HVDC line was able to support a transmission capacity increase of 3,200 MW.  Read on …

Posted in Direct-Current (HVDC) Transmission, Tech Blogs | Tagged , , , , , , , , , , | Leave a comment