2011 Course Schedule

Getting a head start on the coming year, the 2011 course lineup is as follows:  

  • March 29-31, 2011 – Distributed Generation Analysis and Applications Course (New)
  • April 12-14, 2011 – Understanding Location-Based Energy Pricing (New)
  • April 25-29, 2011 – Power Flow and Dynamic Simulation Analysis and Applications Course (5-day course)
  • May 17-19, 2011 – Transmission Planning (New)
  • June 7-9, 2011 – Applications in Voltage Stability  Continue reading
GD Star Rating
loading...
GD Star Rating
loading...
Posted in Training Courses | Tagged , , , , , , , , , , , , , , , , , , , , | Leave a comment

Distributed Generation Impact: Sympathetic Tripping of Protection Devices

by E. Cano, K. Dartawan, R. Austria

One potential impact of interconnecting distributed generation (DG) is the potential sympathetic tripping of overcurrent (OC) protection devices, where a healthy feeder trips unnecessarily for a fault on another feeder. The sympathetic tripping comes from DG with high short-circuit current contribution (typically rotating machines such as Diesel or Gas Turbine units) and can be observed in radial feeders that are fed from a common source.

Also, this issue applies to DG on a lateral-backfeed from the DG to the adjacent lateral circuit. Continue reading

GD Star Rating
loading...
GD Star Rating
loading...
Posted in Photovoltaic Systems and Distributed Generation | Tagged , , , , , | Leave a comment

A Methodology for Estimating Potential Curtailment of Wind Farms

 by Pterra Consulting
Figure 1

A wind farm integrated into a transmission grid is subject to curtailment due to temporary or long-term insufficient capacity on the transmission lines.  Maintenance outage of a nearby line, dispatch of competing wind farms and availability of other generators are examples of system events that may limit injection capacity.  In general, events that increase transmission utilization present potential curtailment conditions for wind farms, and so the daily and seasonal load cycles, and changes to interchange and import/export patterns can influence injection capacity as well.        

In measuring the potential curtailment of a wind farm for, say, the incoming year, it is important to take into account the wind availability as well.  It may seem likely that curtailment will occur when the load is highest and transmission use is greatest; however, this condition may occur in summer when wind availability is low.  Hence, we have the common situation that at summer peak, the available transmission is low, but the wind capacity is also low, resulting in no or minimal curtailment.  Some operating wind farms have observed that most curtailments occur in the spring and fall periods where grid use may be relatively low but wind farm capacities are high.        

One approach to estimating potential wind farm curtailment is to simulate the hourly chronological performance of the combined generation and transmission system taking into account outages, unit commitment, least cost dispatch and load variations.  This method is widely known as production simulation.  In addition to being data intensive and laborious to setup, the simulation duration can be significant, especially if one chooses to run multiple years in a Monte Carlo simulation.  This Blog presents a methodology that is based on an analytical model that is generally much simpler to develop than production simulation models and provides some unique insight into how and how often curtailments come about. Continue reading

GD Star Rating
loading...
GD Star Rating
loading...
Posted in Tech Blogs, Wind Power Integration | Tagged , , , , , , , | 1 Comment

Course Updates for Fall 2010

Oklahoma was certainly a welcoming place as we held our first two courses of the fall season there.  We thank our hosts for their hospitality and for setting up the two courses.  And thanks for the barbecue and salsa lunches!  Yum!  The one thing that the instructors forgot was to take a picture, so we will make do with Dr. Gutierrez’ mug as our graphic for this blog.  Ratings and comments on the courses are as follows: Continue reading

GD Star Rating
loading...
GD Star Rating
loading...
Posted in Training Courses | Tagged , , , , , , , , , , , | Leave a comment

Updated Fall 2010 Schedule and Sample Course Notes

There has been a change in the schedule for two courses this month as follows:

  • Aug 17-14, 2010 – Dynamic Simulations Analysis and Applications Course 
  • Aug 24-26, 2010 – Voltage Stability Analysis and Applications Course 

We will be travelling offsite for these courses.  Continue reading

GD Star Rating
loading...
GD Star Rating
loading...
Posted in Training Courses | Tagged , , , , , , , , , | Leave a comment

Fall 2010 Course Schedule

The upcoming schedule of courses for Fall of 2010 includes a number of mainstay application courses, and a new course on underground cables, offered by Pterra jointly with Electrical Consulting Engineers, Inc.  The lineup:

Continue reading

GD Star Rating
loading...
GD Star Rating
loading...
Posted in Training Courses | Tagged , , , , , , , , , , , , , , , , | Leave a comment

Wind Integration Course – June 2010

Held in Albany, NY, June 15-17, 2010 

What can we say?  We had all the windy people together and spent the next 3 days blowing air.  Seriously, we did get into some serious technical discussions about wind modeling specifics and the energy market in general, including:

  • How best to model a wind farm – lumped as one equivalent, lumped per feeder or detailed representation?  Some further thoughts on this can be found in Wind Farm Integration: On the Use of Agreggate Models
  • Trend of cost allocation for system upgrades.  This was not on the course outline but the discussion led in this direction. 
  • What is the fair way to represent wind farms in integration studies – 100% capacity for summer peak load conditions or some lower capacity or alternate system loading condition.  More on this in The Coincidence of Wind.

Continue reading

GD Star Rating
loading...
GD Star Rating
loading...
Posted in Training Courses | Tagged , , , , , , , | Leave a comment

High Voltage Concern at Wind Farms?

If we think about wind turbines as induction generators, one would assume that these would be VAR (reactive power) sinks, demanding vars from the grid to be able to deliver watts.  However, that may be true from the point of view of only the wind turbines themselves.  In reality, wind farms are far more than a group of small generators.  Electrically, wind farms that deliver at bulk power levels to the grid behave more like a small urban subtransmission grid with characteristics that are far removed from those of a large power facility such as a coal, oil, nuclear or natural gas plant. Continue reading

GD Star Rating
loading...
GD Star Rating
loading...
Posted in Tech Blogs, Wind Power Integration | Tagged , , , , , , , | 1 Comment

Voltage Stability Course – April 2010

Held in Albany, NY

We had a full class, with active participants.  It was fun to teach and hopefully it was also fun to have been a participant in the course!  The participants gave an overall rating for the course of 4.86 out of a possible 5.0.  Thanks!  Also, everyone did a great job on the test reviews.  Thanks for the effort! Continue reading

GD Star Rating
loading...
GD Star Rating
loading...
Posted in Training Courses | Tagged , , , , , , , , , | 1 Comment

HVDC Technology: When 2,000 MW is 2,000-Plus-1,200 MW

 

by Pterra Consulting  

In this Blog, we discuss the amazing story of how a lowly 2,000 MW HVDC line was able to support a transmission capacity increase of 3,200 MW.  Read on … Continue reading

GD Star Rating
loading...
GD Star Rating
loading...
Posted in Direct-Current (HVDC) Transmission, Tech Blogs | Tagged , , , , , , , , , , | Leave a comment